BBS SERVICES
Maintenance
Prioritise safety, continuity and recurring faults.

Prioritise safety, continuity and recurring faults.
Organise preventive and corrective work by criticality, inventory and history. Response times and service levels are agreed for each engagement.
Closeout deliverable.
Maintenance programme and evidence-based findings report.
Acceptance criterion.
Activities and classified findings reviewed with the client.
Four stages of work.
Initial assessment
Inventory, failure history, versions, licences and backups. Findings ranked by criticality.
Intervention plan
Scope, permissions, responsibilities, operating window and contingency agreed with site operations.
Execution and testing
Work under change control. Verify authorised interfaces against agreed acceptance criteria.
Closeout and follow-up
Evidence, open items and recommendations. Results reviewed with the client.
Scope and conditions.
The proposal identifies included activities, exclusions, responsible people, permissions, spares and licences. Critical work requires backups, an authorised window, contingency and rollback testing.
Test protocols and reports may require the signature of a locally registered engineer, depending on the agreed scope.
Let’s define your next step.
Tell us the country, site, installed system and expected outcome.
BBS TECHNICAL GUIDANCE

