Single-phase double-conversion online UPS in tower / rack format.
References: PHS010BR
Double conversion
Tower / rack
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
External maintenance bypass / distribution accessory. It does not provide UPS battery backup.
References: PHSR-BP063
Maintenance bypass
Reference-specific compatibility
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
External battery bank or module. Selection requires documented voltage, connections and UPS model.
References: PHTBATCAB-40480R
External batteries
UPS-specific selection
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
HBIT PHTT three-phase UPS. Size by load, electrical architecture and runtime.
References: PHTT015LR
Three phase
Power engineering
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
HBIT PHTT three-phase UPS. Size by load, electrical architecture and runtime.
References: PHTT020LR
Three phase
Power engineering
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
External battery bank or module. Selection requires documented voltage, connections and UPS model.
References: BP192V12-3U
External batteries
UPS-specific selection
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
1500 VA SmartPro line-interactive UPS. Confirm voltage, outlets and required load.
References: SMX1500LCD
Line interactive
LCD
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Tripp Lite SmartOnline UPS. Select by part number, voltage, load and battery configuration.
References: SU6000RT4UHVHW
Double conversion
SmartOnline
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Tripp Lite SmartOnline UPS. Select by part number, voltage, load and battery configuration.
References: SUINT2000XLCD
Double conversion
SmartOnline
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Tripp Lite SmartOnline UPS. Select by part number, voltage, load and battery configuration.
References: SUINT2200LCD2U
Double conversion
SmartOnline
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Legacy three-phase UPS reference listed in Eaton’s end-of-service table. Intended for installed-system assessment and modernisation.
References: SVT30KX
Legacy
Modernisation assessment
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Legacy reference · review modernisation and support.
Tripp Lite SmartOnline UPS. Select by part number, voltage, load and battery configuration.
References: SUINT1000LCD2U/WEB
Double conversion
SmartOnline
Scope and documentation
Selection depends on actual load, voltage, required runtime, connections and space. A published reference does not confirm stock, commercial lifecycle, included batteries or compatibility. The quotation confirms configuration and lead time.
Double conversion for loads that need backup and power quality. Vertiv Liebert GXE / GXT5, HBIT and Tripp Lite SmartOnline.
Batteries and runtime
Runtime is calculated from actual load, configuration and battery condition. External modules require documented compatibility.
Continuity and monitoring
Bypass, transfer switches, sensors and SNMP communication serve different functions within the backup architecture.
Before selecting: load, runtime and continuity
We review VA and W ratings, voltage, phases, target runtime, space, ventilation, connections and monitoring. Interventions consider servers, access, video and automation continuity, with an authorised work window, contingency and tests. A UPS does not replace certified power supplies required by life-safety systems.
01
Initial diagnosis
Inventory, fault history, versions, licences, backups and criticality.
02
Intervention plan
Scope, permissions, work window, contingency and acceptance criteria.
03
Execution and testing
Change control and testing of authorised interfaces.
04
Handover and follow-up
Evidence, open items, recommendations and client acceptance.
Let’s talk about your building
Tell us about the installed system, objective and location. We define supply and intervention with a verifiable scope.