Recovery and modernization
Recover operation and plan the next stage.

Recover operation and plan the next stage.
Distinguish field faults, communications, licences and engineering. Plan recovery or migration with backups, contingency and rollback tests.
Closeout deliverable.
Assessment, migration plan, backup validation where included, and rollback protocol.
Acceptance criterion.
Agreed functions verified and remaining items documented.
Four stages of work.
Initial assessment
Inventory, failure history, versions, licences and backups. Findings ranked by criticality.
Intervention plan
Scope, permissions, responsibilities, operating window and contingency agreed with site operations.
Execution and testing
Work under change control. Verify authorised interfaces against agreed acceptance criteria.
Closeout and follow-up
Evidence, open items and recommendations. Results reviewed with the client.
Scope and conditions.
The proposal identifies included activities, exclusions, responsible people, permissions, spares and licences. Critical work requires backups, an authorised window, contingency and rollback testing.
Test protocols and reports may require the signature of a locally registered engineer, depending on the agreed scope.