ENGINEERING IN PERU · INTERNATIONAL ENQUIRIES

INSIGHTS · ENGINEERING DECISIONS

EBI 2025: what to assess before an upgrade.

New capabilities matter when they fit the installed base and an operational need.

Honeywell EBI · manufacturer context image
Honeywell EBI · manufacturer context image

Geospatial maps

Relate events to locations to support operator decisions.

OPC UA connectivity

Assess the OPC UA point server client described for EBI 2025.

Trends and reports

Review historical data and operational reporting needs.

Platform evolution

Plan servers, workstations and licences against the applicable compatibility matrix.

The published edition

Honeywell presents EBI 2025 with geospatial map enhancements, an OPC UA point server client and changes to the server and workstation platform. A public release description does not establish an upgrade path for your installation.

What to compare

Review EBI, operating systems, database, interfaces, points, stations, licences and operational restrictions. Include DVM, access, fire, automation, network and supporting power dependencies.

What to agree

The applicable compatibility matrix, migration scope, backup and restoration validation, work window, responsible people, contingency and rollback tests.

What closes the work

Change records and agreed operator tests with results, open items and recommendations. A newer version does not replace validation of the actual system.

Manufacturer information checked on 21 September 2026. Features depend on version, engineering and licences. Official source ↗

A BBS preparation guide. Interventions require an installation assessment and approval from the responsible technical professional.

Let’s define your next step.

Tell us the country, site, installed system and expected outcome.

BBS

What are you looking for?

Examples: