DVM 2025: how to prepare a modernization.

A guide to protecting recording continuity and defining operational improvements.

DVM 2025 · illustrative building from the Honeywell brochure
DVM 2025 · illustrative building from the Honeywell brochure

DVM 2025

Improvement starts with a verified inventory

What the 2025 edition adds

The public brochure highlights the web client, DVM Status, audit investigation and an updated recording engine. Relate those functions to specific operator needs.

What to review in the installed base

The R800 materials describe an earlier release. Record the actual version, cameras and firmware, servers, storage, retention, clients, EBI integration and licences. Do not infer a direct migration path from the family name.

What the plan must protect

Define recording continuity, evidence retention, recoverable backups, permissions, work window, contingency and rollback. The ability to upgrade without uninstalling does not replace that validation.

Which tests support closeout

Agree tests for viewing, recording, playback, searches and authorised export; review communication loss, permissions and included interfaces. Record results and open items with the client.

  1. Initial assessment

    Inventory, failure history, versions, licences and backups. Findings ranked by criticality.

  2. Intervention plan

    Scope, permissions, responsibilities, operating window and contingency agreed with site operations.

  3. Execution and testing

    Work under change control. Verify authorised interfaces against agreed acceptance criteria.

  4. Closeout and follow-up

    Evidence, open items and recommendations. Results reviewed with the client.

References for your decision

Let’s define your next step.

Tell us the country, site, installed system and expected outcome.